Skip to content
English
  • There are no suggestions because the search field is empty.

Maintenance Schedule for Electric Tools

Follow Bristle Blaster Electric maintenance schedule for durable, reliable performance on demanding industrial prep tasks.

Regular maintenance preserves both tool longevity and user safety. Clean all dust, debris, and metallic residue from vents, gears, and accessible moving parts after every use. Lubricate moving parts monthly or after every 40 operating hours. Replace belts and wearable components at the first indication of damage, and always use original MontiPower parts for replacements. Maintain a service log and follow MontiPower’s interval checklist to avoid unplanned downtime.

For questions (technical or quotation wise), contact info@montipower.com, our live chat, contact form, or WhatsApp: +1 (555) 885-4642.